This slide shows an illustrative example of applying risk to value and cost. It represents one possible way to link cells in spreadsheet to calculate the affects of identified risks on value and cost. The point is that for each identified risk, the probability of occurrence and impact on cost or value must be determined. This will allow for the calculation of risk adjusted cost and risk adjusted value in the context of VMM
| Previous slide | Next slide | Back to first slide | View graphic version |